Skip to content
JOTS Rentals — portable restroom and dumpster rentals

Construction

Sanitation that scales with a commercial build

Crew counts change every phase. We adjust unit counts and service frequency with them, on one account across every site you are running.

  • Standard units at one per 10 workers, reviewed each phase
  • ADA-accessible unit anywhere the public or inspectors reach
  • Hand-wash stations at the break area and near any food service

Mon–Fri 7am–5pm · 24/7 emergency service available

Portable restroom and roll-off dumpster on a commercial construction site
Licensed & InsuredLocally OwnedFive Texas YardsSame-Day DeliveryTransparent Pricing

Sound familiar?

  • Unit counts set at mobilization and never revisited as the crew grows
  • One service schedule applied to every site regardless of traffic
  • Separate vendors and separate invoices for restrooms and containers
  • Nobody to call when an inspection is tomorrow and a unit is down

Sizing a commercial job, phase by phase

A commercial build is not one crew. Sitework runs light, framing and MEP stack trades on top of each other, and finish-out thins out again. Setting unit counts once at mobilization means you are over-supplied for two months and short for three.

OSHA 1926.51 sets the floor: one toilet for up to 20 workers, two for 21 to 199, and one more per additional 40 beyond that. The practical target most superintendents use is one unit per 10 workers, because a unit at capacity is a unit the crew avoids — and a crew walking off site to find a gas station bathroom is lost labor.

Tell us the phase schedule when you book and we will plan the ramp with you instead of reacting to it.

What a commercial site usually runs

  • Standard units distributed by work area, not clustered at the gate — a unit five minutes away gets used, one across the site does not
  • ADA-accessible unit anywhere inspectors, owners, or the public reach
  • Hand-wash stations at the break area, and required anywhere food is served
  • Holding tanks for an office or sales trailer with no sewer connection
  • Roll-off dumpsters, typically 30 yard with scheduled swaps, sized down to 10 or 20 yard when the debris is heavy rather than bulky

Access and placement

Commercial sites fail on access more than space. We need about 60 feet of straight approach for a roll-off truck, 22 feet for the container, and real overhead clearance for the lift arms. Send a pin and a photo of the drop area when you book; if the approach is tight we would rather tell you before delivery day than after the truck cannot get in.

As the building goes vertical, plan for the container to move. A box that was well placed during sitework is often in the way once steel is up.

Billing that works like a contractor account

One invoice across sites, a dedicated rep who knows which job is which, and service frequency set per location. Call to set up an account and we will walk through billing terms for your company.

What we usually recommend

  • Standard units at one per 10 workers, reviewed each phase
  • ADA-accessible unit anywhere the public or inspectors reach
  • Hand-wash stations at the break area and near any food service
  • 30 yard roll-offs with scheduled swaps through framing and finish-out
Browse all services →

We also serve

  • Land development and site prep
  • Hospital and medical facility construction
  • School and university construction
  • Retail and restaurant build-outs
  • Office and mixed-use development
  • Municipal and civic buildings

Not listed? We rent to job sites of every kind — call and describe it.

Common questions

How do you handle a crew that doubles mid-project?

Tell us the phase schedule up front and we plan the ramp with you. Adding units is usually next-day, and service frequency moves with the count rather than staying at whatever was set on day one.

Do you provide restrooms for the site office or sales trailer?

Yes. A deluxe flushable unit is the usual choice near an office or trailer where clients and inspectors visit, and a holding tank covers a trailer with no sewer connection.

Can we run several active sites on one account?

Yes. Multi-site contractor accounts get consolidated invoicing, one dispatcher who knows your jobs, and service frequency set per location instead of one blanket schedule.

Service area

Serving 300+ ZIP codes across East Texas, North Texas, and DFW

Five yards — Longview, Tyler, Kemp, Mt. Pleasant, and Whitewright — so a truck starts close to your job rather than driving across the state to reach it.

See every town we serve

43 counties · 300+ ZIP codes. Not sure if we reach you? Call and ask — we cross our own boundaries regularly.

Ready to get it handled?

Call now for same-day answers, or send the form and we will price it today.

Mon–Fri 7am–5pm · 24/7 emergency service available